Tracking Water Rights Compliance
IAMDD automatically tracks water right usage as the hydraulic engine runs the simulation across time.
To view your accounting results: 1. Run a hydraulic simulation. 2. Once complete, click on Results in the top navigation bar, then select System Simulation Results. 3. Navigate to the Water Rights Accounting chart.
This interactive chart visualizes: * Cumulative Withdrawals: A running total of the water pulled through the assigned infrastructure over the simulation timeline. * Legal Maximums: A horizontal boundary line indicating the maximum volume defined in your library.
By comparing the cumulative withdrawal curve against the maximum limit line, you can instantly determine if your operational scenario remains compliant, or if you need to adjust demands, implement conservation policies, or rely on supplemental sources.